
Project 01
Roper Hospital Emergency Power Infrastructure Upgrades
CSG was contracted by Roper St. Francis Hospital to perform the construction services for the installation of a new permanent 2,000 kVA Generators project located at Roper Hospital, in Charleston, SC, which was a Federal Emergency Management Agency (FEMA) Grant project. The scope of work consisted of an auger-cast pile foundation for the construction of a three-level, structural steel framed, 13,450 square foot building addition, expanding the existing physical plant. The building was designed and constructed for future expansion of a chiller and cooling tower, which CSG ended up performing for Roper Hospital, as well. Finally, a 500 gallon fuel tank was installed to increase the capacity of Roper Hospital’s emergency generator systems.
- Location
- 316 Calhoun Street, Charleston, SC 29401
- Project size
- 13,450 SqFt
Learn more: Roper Hospital


